TopoCadLine portfolio
2006-202620 years of performance
120,000+ hadrone surveys
15,000+cadastral files submitted
800+construction sites
Experience and trust are built step by step.
The TopoCadLine portfolio has been built through repeated collaborations with construction companies, design firms, industry, infrastructure and real estate developers. We thank the clients who chose us for work where precision, speed of response and accountability mattered. We are proud to have worked with these clients and to have contributed to important projects through solid surveying and geodetic solutions.
Synergy Construct
Elygator, Rotterdam Maasvlakte, the Netherlands: permanent survey support for the construction of a water electrolysis plant producing green hydrogen. Setting out of the design elements, verification of the works, levels, surveys, site plans and official site records.
Polyol Project: construction of the MOL refinery.
Debrecen BMW Plant: construction of the car production line with precast elements, Hungary.
CATL EU2 Project: construction of an electric battery factory in Germany.
Precast Facility Polgar: precast element factory in Hungary.
Fashion House Outlet Center Militari: permanent survey support, setting out of pad foundations, column plumbing and post-construction checks.
Rose Garden: survey support and setting out for two residential blocks.
High Construction - Cosmopolis
Cosmopolis Residential Complex, Stefanestii de Jos, Ilfov: site survey support for roads, alleys, civil buildings and utility networks in phases 2, 3, 4A, 5, 6 and 7.
Road design and vertical grading, design of sewerage and stormwater networks.
Cadastral registration of all completed buildings, car parks and roads.
A1 motorway, Cornetu - Tigveni section, 37.4 km: topographic surveys for design and construction.
Verification and densification of the setting-out control network.
Cadastral documentation for zoning plans and related cadastral checks.
Midia Natural Gas Development Project: the STG gas treatment plant at Vadu, Constanta county.
Survey support for positioning bored piles, dewatering wells and geotechnical investigations.
Mihai Eminescu: setting out of the capping beam, piles and structural elements.
Calea Vacaresti B2+GF+7F: setting-out network, pile and structural element setting out, checks and surveys.
Calea Floreasca/Ford Factory: borehole setting out and topographic plan.
Popa Savu: control network, setting out, surveys and structural monitoring.
Panait Istrati: pile axis setting out and property boundary check.
Iresti: pile axis setting out, settlement monitoring of neighbouring buildings, topographic survey and spot-level plan.
Moll Chitila and Popa Nan: borehole setting out and topographic plans.
Piata Amzei: control network and axis verification.
Swan Office Complex: pile setting out, checks, drawings and monitoring of capping beam movement.
Mendeleev P+5F: control network, setting out, checks and drawings.
Iris Shopping Center Titan III: pile positioning and setting-out network.
UniCredit Tiriac Bank Expozitiei: positioning of 900/1200 mm piles, capping beam setting out, retaining piles, dewatering wells and excavation volumes.
MS Interproiect SRL
3D structural survey of the DN 73 Dumbraveni bridge.
A0 Bucharest ring road, overpass across the A2 motorway: survey support for steel deck erection, girder positioning, falsework positioning and post-construction checks.
A0 Bucharest ring road, overpass across the A1 motorway: survey support for steel deck erection, girder positioning, falsework positioning and post-construction checks.
Arch bridge over the Dambovita river, DN73: survey support for steel deck erection, girder positioning, falsework positioning and post-construction checks.
Steel decks on the A7 Ploiesti-Buzau motorway, Lot 3, Nurol-Makyol joint venture: survey support for erection, girder positioning, falsework positioning and post-construction checks.
Bog'Art
Mega Mall Bucharest: site survey support and technical assistance for the concrete structure and the erection of monolithic columns.
ANAF Lucretiu Patrascanu: survey support, cadastral consultancy and surveys.
Str. Ostasilor GF+6F: structural monitoring over time.
Cadastral support for land, office buildings and industrial halls.
Unirii View: cadastral consultancy, topographic surveys and building registration.
Brasov-Ghimbav International Airport, phase III: OCPI construction permit documentation.
A1 motorway, Lot 4 Orastie-Sibiu, km 65+965 - km 82+070: survey support for the erection of steel viaducts of approximately 750 m and 350 m.
Constanta bypass, Basarab overpass, RomExpo, UniCredit Tiriac Bank Expozitiei and City Mall: structural setting out, checks and monitoring.
Bacau Sports Hall: topographic and cadastral checks, property boundary, axis setting out and excavation volumes.
Gima Bd. Timisoara: vertical extension and positioning of the steel structure.
Glucozei: office building of over 20,000 sqm, setting out of foundations and steel columns.
Valenii de Munte: crane runway verification.
Bolintin Deal: check of columns and steel plates in plan and level.
PMB: setting out of the external lift axes.
Fundulea: setting out of the overhead crane runway girder axes and post-erection checks.
Greenvolt
Photogrammetric surveys for two wind farms: Ialomita - 10,000 ha and Calarasi - 7,000 ha.
Work carried out with a Trinity Pro fixed-wing drone fitted with two cameras.
Surveying and geodetic work for the A0 motorway: setting out for earthworks and for the asphalt layers.
Establishment and use of a control network for construction.
Level checks after construction and geometric control of the elements built on site.
ALARKO SRL - A0 motorway
Topographic surveys, point cloud generation and volume calculations.
Automated monitoring of 3D displacements, with results published in real time on a web platform.
Collini Lavori SPA Trento
Modernisation of the Danube bridge and the Giurgiu border crossing.
Office team: volume calculations and as-built surveys for the asphalt works.
Support in obtaining the cadastral approvals required to start the works.
North Macedonia, Beljakovce - Kriva Palanka railway: establishment of the survey control network and surveys of the rail alignment for design.
Sebes, Mercedes plant: topographic survey and site plan for design.
A4 Constanta bypass and the connection with the A2 motorway: setting out of excavations, base layer, asphalt, sign and panel foundations.
Basarab overpass: alignment of the stay cable support elements.
Popesti production hall: foundation and axis setting out over 800 sqm.
Serban Voda Hospital extension: surveys, setting out of axes and levels, as-built drawings.
Viscofil Industrial Complex: setting out of pad foundations, positioning of anchor bolts and steel plates.
Calea Vitan 2B+GF+11F: setting out of foundations and walls.
Nicolae Caramfil office building: setting-out network, setting out of structural elements, structural monitoring, as-built surveys, longitudinal profiles for the lift shaft walls and curtain wall setting out.
Strada Zagazului: survey control network, surveys and checks.
Adelaide Residential Complex: setting out and checking of structural elements for 5 GF+2F buildings.
Grigore Alexandrescu: two GF+5F residential buildings.
Crivina dam: establishment of the setting-out network, topographic survey, site plan and deflection calculation of the steel bridge for rehabilitation and redesign.
Surveying and cadastral consultancy, surveys and as-built drawings for area verification and cadastral plans at the Bucharest offices, including Str. Vaselor 27 and Str. Vaselor 34.
Ports of Corabia, Bechet, Oltenita and Giurgiu: setting-out networks, topographic and bathymetric surveys, boundary setting out, spot-level plans and cross sections referenced to local datums.
Pantelimon Medical Centre: site support, foundation setting out, interior partitions, facades, cadastral checks, property boundary and excavation volume calculation.
Mall Vitan extension: site support, setting out of foundations and the steel structure, facade setting out, topographic and cadastral checks.
Alum Tulcea: survey of the red mud and slag pond over approximately 95 ha and contour plans.
Industria Sarmei Campia Turzii: survey of the area adjacent to Steel Plant no. 2 and topographic plan.
Laromet: alignment of the straightening machine.
ISPE S.A.
The Crivina, Clejani, Afumati, Peris, Dragomiresti, Toporasi, Colibasi, Morarilor and Drumul intre Tarlale substations: topographic surveys and spot-level site plans for design.
Pipera Residential Complex: post-construction topographic plan, establishment of the survey control network, setting out and checks.
Melbourne Residential Complex: setting out, checks, as-built, utility networks and access road.
Straulesti Residential Complex: post-construction plan, survey control network, setting out and checks.
Adelaide Residential Complex: surveys for road and utility design, setting out of axes, utilities and road.
Sydney Residential Complex: post-construction plan, setting out and checks for roads and utilities.
Andrew and Darwin II: surveys with cross and longitudinal sections for design.
Modernisation of DN1 between Baneasa and Otopeni: 4 km of road, 4 km of ramps, two road overpasses of approximately 1 km with ramps, two footbridges and utility networks.
Bd. Doamna Ghica - Piata Delfinului connection: 2 km of road and a road overpass across the railway.
Extension and modernisation of DN1 with the Baneasa underpass, 1 km of road, 1.5 km of ramps and utilities.
Planorama Residential Complex: permanent survey support, establishment of the setting-out network, setting out of walls and foundations, post-construction checks, land boundary checks and structural monitoring over time for 3 buildings 2B+GF+16F.
Buzau Mall and Piatra Neamt Mall: establishment of the setting-out network, setting out and topographic/cadastral checks.
Suceava Mall: survey consultancy, verification of the setting-out network and topographic/cadastral controls.
Minerva Construct
Constanta bypass bridge: excavation volume calculation for both abutments and calculation of the pile breaking volume.
Cosmopolis: setting-out and positioning checks for residential building elements, as-built surveys, setting out of axes and walls.
House GF+1F: setting out of building axes, excavation levels, walls and columns.
Campina, GF+1F villa: setting out of building axes, property boundary and building levels.
Braila wastewater treatment plant: girder checks for 3 overhead cranes and setting out of axes and levels for the runway erection.
Basarab elevated road overpass: alignment of the supports for the cables carrying the steel bridge structure.
Babes Hospital extension: topographic survey and setting out of building axes.
Veronica Micle: topographic survey and setting out of building axes.
Cristiana Monastery church: topographic survey of the existing church, site plan and setting out of wall corners.
Danfoss and Menatwork: survey and spot-level plan for the structure and the overhead crane runway.
Cosmopolis Owners Association
Cosmopolis: setting out of parking spaces, tennis court and basketball court, establishment of the setting-out network, checks and survey calculations.
Concelex
Magurele Laser: setting out of foundations, columns and walls.
Verticality checks and geometric control of the executed elements.
Cernavoda Nuclear Power Plant: setting out of platforms, roads and buildings.
Post-construction checks for the works carried out on site.
Sewerage system for the town of Comarnic: setting out for construction, topographic checks and as-built documentation.
Surveying and geodetic control of the network elements and of the works carried out.
Various real estate projects, with surveying work and technical support for design and construction.
Project details will be added once the list of works has been verified.
Lacul Morii Tower: topographic survey for design, spot-level plan, property boundary check and determination of the church height.
Cadastral work to remove overlaps and register the building.
The works carried out will be added later.
Capability to install systems for daily automated structural monitoring, with real-time data transmission over the internet and alerts when displacements exceed the defined thresholds.
Over 15,000 cadastral and land registration files completed for private individuals and companies.